Abene VHF3 Maintenance Autumn 2024: verschil tussen versies
Regel 19: | Regel 19: | ||
* Julia | * Julia | ||
* Your Name Here. | * Your Name Here. | ||
+ | |||
+ | ==Notes== | ||
+ | |||
+ | Re the X axis DRO: | ||
+ | |||
+ | "I have switched the connectors around so it isnt the DRO. I have disconnected the linear encoder from the machine and tested its entire reach and gotten no change in readout. | ||
+ | It think its unlikely that cleaning it will fix. So unless it is a loose connector somewhere it will probably have to be replaced." - Robert Konings |
Versie van 2 okt 2024 om 00:09
Intro
The Abene VHF3 Mill is in need of some TLC. This wiki page is to track what needs doing.
To fix
- DRO X Axis not working
- DRO Z Axis drifting
- Gearhead in need of lubrication
- Coolant pump not working
- Coolant full of bacteria
- ??
When
Suggestion for first Mill TLC session is 1400 on Saturday 5th October 2024. Who can make it?
- Julia
- Your Name Here.
Notes
Re the X axis DRO:
"I have switched the connectors around so it isnt the DRO. I have disconnected the linear encoder from the machine and tested its entire reach and gotten no change in readout. It think its unlikely that cleaning it will fix. So unless it is a loose connector somewhere it will probably have to be replaced." - Robert Konings