ToDo: verschil tussen versies
(→Blue Laser engraver/cutter) |
(→Wiring: patched in a few unknown cables, connected blue laser to already patched (20 avaya)) |
||
Regel 35: | Regel 35: | ||
* Affix the dangling small 2 port junction box to the concrete slab above the space door. Plug's are in a box labeled thus in the green cabinet; the big green metabo drill in the woodshop can be set to hammering. | * Affix the dangling small 2 port junction box to the concrete slab above the space door. Plug's are in a box labeled thus in the green cabinet; the big green metabo drill in the woodshop can be set to hammering. | ||
− | |||
=== recurring === | === recurring === |
Versie van 27 jun 2019 om 11:07
We maintain the space collectively - as an all volunteer effort.
Inhoud
Physical things
- Make a good photo of the first aid box -in-situ- that shows clearly where it is; and put it on FirstAid EHBO Doos
- Make good photos of the fire-extinguishers; -in-situ- that shows clearly where they are and put on Fireextingishers including expiry dates.
New dust control for the wood workshop: Succobus
- Tubing:
Put short pipes on each T junction behind each machine; then the Valve, then a short pipe and then a bit of hose of the right length.Secure with hose clamps. We'll need to make a few wooden/plastic adaptors on the lathe to get the diameters right.
- Electrics:
- Feed the bare-copper wire through all the tubes -- to stop static dust collection.
red laser engraver/cutter
- put config file on github
- update wiki with new visicut
Blue Laser engraver/cutter
- Specialist work. Don' t undertake unless comfortable and capable. See Blue_laser_engraver
- correct fan wire in power supply contacting fan blades making noise
- Check focus and mirrors (Since it engraves less well then the red one, currently).
- non-dangerous work:
- update Blue_laser_engraver (Add a picture)
- Honingraatbed?
- Top-up the cooling water (with demineralized 'laser' water with a drop of the 'no-green-stuff--stuff')
Put config files on github(Also for the red one, and maybe compare them?)
lights
- Hang the warmer lights in the small room (preferably before Hans returns! as he donated them.)
- We might need to get cable etc. first
Wiring
- Affix the dangling small 2 port junction box to the concrete slab above the space door. Plug's are in a box labeled thus in the green cabinet; the big green metabo drill in the woodshop can be set to hammering.
recurring
- vacuüm small room
- And maybe the larger one too (or use a broom)
- Dishes
- clean kitchen
- clean toilet
- put bin out on the right day - volunteer in CRM
- Check the various boxes with drills and replace them from the supply.
- Clean and reoil the various metal working machines - including a thin coat of slideways-oil / lijbaan olie on the gangways/slides/lijbanen.
- Return misplaced tools to where they belong.
Documentation things
- Update the wiki to describe the second garbage bin processes.
- We have quite a few Tools without foto's or where we use bland photos from HBM. To replace. Ideally in situ so you know where things are.
- Video of an expert (e.g. HansD) replacing & adjusting the knifes on the planer/jointer with the special tool.
Cyber Things
- Add OpenID or similar to the CRM and push/wire this up to wordpress and the wiki.
- Find and install crosspost module on wordpress to twitter/facebook.
- See if we can do post-by-email or simpler for wordpress.
repairs
floor
- fix holes in floor in large room (with the right kind of concrete / get it somewhat level and evenly)
- procure/find/ask shops for scraps a piece of linoleum for the small room. Same thickness, any color. About .. cm wide / .. m long. Or smaller pieces that add up. Also glue and filament (for the seams).
- put it all in place, fixing the "gutter" in front of E-table.
electric
- There is one outlet left of the abene that does not work, possibly a loose wire?
- We 're out of 12V halogen bulbs for the small desklights (But the white/translucent one has had it's bulb replaced with the last spare)