ToDo
We maintain the space collectively - as an all volunteer effort.
Physical things
- New dust control for the wood workshop: Succobus
- Tubing:
- Put short pipes on each T junction behind each machine; then the Valve, then a short pipe and then a bit of hose of the right length. Secure with hose clamps. We'll need to make a few wooden/plastic adaptors on the lathe to get the diameters right.
- Electrics:
- Run a 3 phase cable from behind the bandsaw over the wood-storage area to the Succobus box.
- Wire up the 3 phase with the slow-starter & wire the slowstart to the control box.
- Collector:
- Figure out of/how we put a thin dust collector above the separator.
- Mount this on the wall.
- Check if we need to remove the 90 degree angles/replace by 3x30 to get better flow.
- See if we need to attach the separate to the wall - and het the drum 'drop' down below it.
- Tubing:
- Run 3 ethernet cables to the space-door for the checkout node; and touch screen/etc.
- Terminate the loose ethernet cable and figure out where they go.
- Update the wiki to describe the second garbage bin processes.
Documentation things
- We have quite a few [[Category::Tools]] without foto's or where we use bland photos from HBM. To replace. Ideally in situ so you know where things are.
- Video of an expert (e.g. HenkD) replacing & adjusting the knifes on the planer/jointer with the special tool.
Cyber Things
- Add OpenID or similar to the CRM and push/wire this up to wordpress and the wiki.
- Find and install crosspost module on wordpress to twitter/facebook.
- See if we can do post-by-email or simpler for wordpress.